Offer description

Building in a prestigious residential area:

- just 1 km from the beach,

- with its own parking lot,

- ideal for a commercial and residential investment.

The property covers a plot of 847 m2 .

The fenced property houses a 307 m² office building . The single-story building includes a partial basement and offers favorable exposure from Legionów Street.

The building's interior includes a variety of office spaces, social, utility, and technical rooms. The plot is regular in shape and includes parking. The property has access to power, water, sewage, telecommunications, and heating networks.

Nearby

  • 150 m – public transport stop,
  • 350 m – provincial road no. 468,
  • 750 m – Gdynia Wzgórze Św. Maksymiliana railway station, shopping center – Centrum Riviera,
  • 1 km – Gdynia Stadion railway station, Baltic Sea,
  • 3 km – Kosciuszko Square,
  • 7 km – Sopot.

Planning conditions

The property is not covered by the local spatial development plan. In accordance with Resolution No. XI / 342/19 of the Gdynia City Council of August 28, 2019, the property is located in areas marked with the M1 symbol - areas with a predominance of single-family housing and small residential houses .

Location

Possible use of the property

The investment potential is a very attractive location, among villas and close to the sea. The plot with a parking lot is also an advantage. The property is ideal for conversion into a residential unit combined with an office or service premises.

Sales assumptions

The sale is conditional on the establishment of limited property rights of access to the telecommunications infrastructure remaining within the property, including:

  • 117.16 m2 of space in the building for use as telecommunications equipment – on the ground floor: 85.71 m2 , in the basement: 31.45 m2
    Taking into account additional costs, it is possible to consolidate the equipment, freeing up approximately 15 m2 on the ground floor and 10 m2 in the basement.
  • 27.80 m2 of land on the basis of use for a container with a generator
  • area of 7.40 m2 on the facade and 10.06 m2 on the roof, on the basis of use
  • area of 46.22 m2 in the ground, on the basis of transmission easement

The current electricity connection will remain for the needs of OPL's technical equipment. The contractor will install a new power connection on its own.

It is possible to develop a design to optimize the space occupied by the power plant equipment on the ground floor and the battery room in the basement. At the investor's expense, the equipment can be relocated to other technical rooms after sale, after appropriate adaptation.

These materials do not constitute an offer within the meaning of the provisions Of the Civil Code, or any part of such an offer or any other the contract. All information contained in the materials is provided in good faith, however, cannot be considered as representations or assurances as to any circumstances.

Closest