Planning conditions

The provisions of the study of March 28, 2018 are in force: OPL property located in the Big City Zone, Functional and Spatial Unit: Multifunctional Quarter Śródmiejskie III - W3b.

Intended use: areas of multi-family housing and service buildings.

Offer description

Office building in the center of Łódź.

The property covers a plot of 1,028 m 2 .

The fenced area includes an office building with an area of 1,214.70 m 2 . An office building with 4 floors with a basement. Inside the building, there are various areas (including office layout, larger rooms), as well as social, utility and technical rooms. The main entrance to the property is on the north side (courtyard). Property with access from al. Kosciuszko 122.

The facility is equipped with installations: electricity, sanitary and rainwater sewage system, central heating and telephone.

Near:

  • 100 m - Charlie cinema
  • 150 m - tram stop
  • 200 m - Piotrkowska Street
  • 250 m - bus stop
  • 320 m - a large grocery discount
  • 500 m - Lodz University of Technology
  • 1.75 km - national road No. 91
  • 2.5 km - "Łódź Fabryczna" railway station

Location

Sales assumptions

The condition for the sale of the property is the establishment of a Limited Property Right in favor of Orange for the technical infrastructure regarding:

  • area of 344.60 m² in the building, on a usufruct basis
  • area of 37.8 m² in the ground, based on a transmission easement
  • area of 47.35 m² on land, on a usufruct basis
  • area of 78.83 m² on the façade, based on a transmission easement

 

Additional information

It is possible to select a bidder in advance and sell the property before the end of the promotion.

These materials do not constitute an offer within the meaning of the provisions Of the Civil Code, or any part of such an offer or any other the contract. All information contained in the materials is provided in good faith, however, cannot be considered as representations or assurances as to any circumstances.

Closest