Offer description

A complex of buildings for apartments or a hotel, 30 km from Szczecin.

The property includes:

Office building - a historic red brick building with a usable area of 337.95 m 2 , distinguished in the vicinity. It has 3 floors, including an attic and a basement. The functional layout includes office, utility, social and sanitary rooms. Built-in traditional technology, made of ceramic bricks, hipped roof covered with tiles. Available installations: electricity, water and sewage, hydrant, lightning protection, fire protection, alarm protection. Heating from the municipal network. The office and technical building are connected into one building by a link.

Technical building - 3-storey, with a basement with a usable area of 909.53 m 2 . The functional layout includes technical, storage, office and sanitary rooms. Available installations: electric, fire, alarm protection, hydrant, lightning protection.

The garage and warehouse building is a one-story building, made of ceramic bricks, with a single pitched roof. Usable area - 242.42 m 2 . Available installations: electric, hydrant, fire, alarm security.

Plots no . : 179/3; 179/4, 179/2, 178/58, 178/91, with a total area 1688.50 m 2 form a whole. The area has a network of water and sewage systems, electricity, gas, telecommunication, and central heating. There is a parking lot on the plot. The entrance to the property is directly from Księcia Bogusława Street.

Near:

  • ul. Księcia Bogusława x - the main street of the village
  • up to 200 m - 2 large-format stores
  • 200 m - bus station
  • 350 m - DW106
  • retail and service points
  • Polish Post, school and school playground

 

Planning conditions

In accordance with the provisions of the applicable SUiKZP approved by RESOLUTION No. LXV/499/23 OF THE MUNICIPAL COUNCIL IN PYRZYCE of 26 October 2023 on the adoption of the Study of conditions and directions of spatial development of the city and commune of Pyrzyce, the real estate is located in the area designated as:

  • UC - areas of center-forming services and city center development

1. Dominant function – service development and residential development;

2. Complementary function:
- temporary service facilities (markets, restaurant gardens),
- sports and recreation services,
- public squares, parking lots;

Investment opportunities : trade, services, housing.

Location

Sales assumptions

The condition of the sale is the establishment of limited rights of paid use of technical premises for telecommunications equipment and the free establishment of transmission easements for telecommunications infrastructure both in the ground and on the facade of the roof and buildings.


Limited property rights should cover the premises (numbered according to the inventory) located:

in BUILDING A - technical
:
- in the basement:
- room no. 0.05 (cable room) – area 51.85 m2
- room no. 0.06 (gym) – area 39.47 m2
- room no. 0.04 (battery room) – with an area of 46.30 m2 – the room will be used by OPL until the batteries are moved to room no. 0.06.
Access to the battery room is through room 0.03 (vestibule). After moving the equipment from room 0.04, the area required for technical infrastructure in the basement of Building A will be 91.32 m².
- on the ground floor:
- room no. 1.03 (CA) – area 47.09 m2
- room no. 1.04 (PG) – area 53.80 m2
- room no. 1.05 (LLU) – area 6.88 m2
- room no. 1.06 (office) – area 19.95 m2
The area required for technical infrastructure on the ground floor of building A will be 127.72 m2

in BUILDING C warehouse - garage:
- room no. 3 (aggregation room) – area 38.30 m2
- room no. 5 (fuel tanks) – area 11.80 m2
The area required for technical infrastructure in building C, warehouse and garage, will be 50.10 m2 .

The total area required for telecommunications infrastructure in building A (technical) and building C (warehouse) will be 269.14 m2 .

On the ground of plot 179/4 there are active elements of telecommunications infrastructure: sewer lines: 28-holes with a total length of approx. 28 m (0.8 m wide), 12-holes with a total length of approx. 1 m (0.7 m wide), 1-hole 5 m long (0.1 m wide), three SK-6 cable pits (1.9x1.2 m), condensers are located on the ground (2x4 m cage), on the ground of plot 178/58 there is a 12-hole (0.7 m wide) sewer section 3 m long. On the ground of plots 179/2, 179/3 and 178/91 there are no active elements of telecommunications infrastructure used by DiSU. The total transmission easement in the ground for OPL is 88.14 m2 .

Additional information

The existing power point will be used for the OPL part. For the part of the object being sold, a new power supply point should be built from the power industry and a new RGnn ( low voltage main switchboard ) located in the basement on the wall adjacent to the power plant (room 0.06). Until a new supply point is obtained and an energy contract is concluded with the energy supplier, the buyer may be temporarily supplied from the RGnn OPL switchgear and metered with a sub-meter. Until a new supply point is built, the buyer's electricity consumption should be accounted for as a surplus over the historically average consumption by OPL.

These materials do not constitute an offer within the meaning of the provisions Of the Civil Code, or any part of such an offer or any other the contract. All information contained in the materials is provided in good faith, however, cannot be considered as representations or assurances as to any circumstances.

Closest