Planning conditions

Study of the Conditions and Spatial Development of the Żórawina Commune (Resolution of the Żórawina Commune Council No. XVII / 109/2005 of October 27, 2005) - intended use: T - telecommunications service devices.
(According to the Study, it is possible to apply for conditions for changing the building development of the WZ, e.g. broadly understood services).

Offer description

Investment land near Wrocław, close to DKS8 and the A4 motorway.

The entrance to the property is from the main street, the plot is fenced and developed with an office and service building, with a 4-storey and 2-storey part. Built-in the 1930s, the facility was rebuilt and modernized many times. Built-in a traditional construction, brick, with a full basement. After the last modernization, the building was put into use in 2000, it is technically free and arranged in the arrangement of offices and open space.

The facility located on the plot can be expanded or completely demolished. An additional advantage is the hardened parking lot for approx. 50 cars located on the premises of the property. The undeveloped area of the plot can be extended with additional usable space. Thanks to this, the property can be used for production, logistics or hotel spaces.

Near:

  • 300 m - Discount store
  • 350 m - Park in Żórawina
  • 1.4 km - the Commune Office
  • 1.6 km - Żórawina Railway Station 8 km - DKS8

Location

Possible use of the property

Based on the analysis of the surroundings, it is possible to divide the property into approx. 31 building plots + plots for road infrastructure and the construction of 31 single-family houses, which will increase the usable area by approx. 6,500 m 2 .

Orange Polska SA stipulates that the real property data specified in this offer, specifying its investment potential, in particular with regard to the given PUM / PUU values, constitute an estimate of Orange Polska SA and may differ from the actual values. Due to the above, these data do not constitute a binding element of the offer.

Sales assumptions

The condition for the sale is the establishment of limited property rights to access the telecommunications infrastructure remaining within the property:

  • area of 25.86 m 2 in the building, on a usufruct basis
  • area of 424.57 m 2 in the ground, on the basis of transmission easement
  • area of 0.01 m 2 on the façade, on the basis of transmission easement

 

 

Additional information

The office building is connected to the municipal water supply and sewage system; has its own oil boiler room.

These materials do not constitute an offer within the meaning of the provisions Of the Civil Code, or any part of such an offer or any other the contract. All information contained in the materials is provided in good faith, however, cannot be considered as representations or assurances as to any circumstances.

Closest